Product Detail :
|
Require competent agency for loading and transportation of raw coal from mines of SECL to washery/power plant, Transportation of clean coal from washery to siding, transportation of rejects from washery to power plants/siding at various leads from 0-60 kms. loading of coal into tippers and railway wagons. Transportation of fly ash/pond ash for a distance of approx. 1 to 6 kms. from 2 x 135 MW, 2 x 30 MW and 2 x 50 MW thermal power plant at village-kasaipali chakabura and ratija respectively korba, chhattisgarh, for a period of 02 years as per details below Transportation of raw coal, washed coal, reject coal and ash by self-tippling open tipper/trucks dully covered with tarpaulin or suitable mean, as per MOEF & CC notifications and guidelines up to designated location. 2. Loading of raw coal /washed coal/reject coal/ash at identified location. 3. Deployment of adequate loaders of suitable capacity at various coal washeries/power plants railway sidings & coal mines for loading into railway wagons and tippers. Transportation of raw coal, washed coal and reject coal is 22,40,000 MT/month. Transportation and loading of coal and rejects within plant, is 15,25,000 MT/month, loading leveling and transportation of ash is 2,00,000 MT/month. raw coal loading at mines is 11,20,000 MT/month, washed coal loading into wagons is 8,96,000 mt/month.
|