Product Detail :
|
Erection of temporary stopping by old reject conveyor belt in -16ls and -23ls lhcm panel (ii) preparation of intermediate sump for proper dewatering. (iii) shifting of pump along with pipe line. (iv) lying of pipe line etc. in dep. panel -16ls.
|
Tender Detail : |
(i) erection of temporary stopping by old reject conveyor belt in -16ls and -23ls lhcm panel (ii) preparation of intermediate sump for proper dewatering. (iii) shifting of pump along with pipe line. (iv) lying of pipe line etc. in dep. panel -16ls (i) erection of temporary stopping by old reject conveyor belt in -16ls and -23ls lhcm panel (ii) preparation of intermediate sump for proper dewatering. (iii) shifting of pump along with pipe line. (iv) lying of pipe line etc. in dep. panel -16ls |