Product Detail :
|
Construction of boundary wall and other development work. Purchase of material for handpump, power pump repairing work. Drain work. Installation of sluice valve. Water tank ( OHT) valve greasing work. Laying of 80 mm GI pipe line. Repair work of main pipe line and maintenance work of pipeline. Remove work of stranded / fallen motor pump. Repair work of 500 mm pipeline. Hindi
|