Product Detail :
|
Construction of head sluice for RBC and remodeling of earth work of bund between rd 0 to 1260 m LBC canal including earth work and cc lining from rd 0.00 m to 3000 m including construction of open trugh and 8 nos structure of LBC and earth work of RBC and basaha minor canal and head sluice of basaha minor and fixing of 8 nos outlets of tank scheme. Remodeling of earth work with 1 nos fall at spill channel and earth work and cc lining of lbc main canal including 1 nos VRB of lbc and 2 nos VRB of RBC and rcc channel from rdd 1590 m to rd 1740 m of LBC and from rd 840 m to rd 1290 m of RBC and 30 nos direct outlets structure of phutamuda scheme. Hindi
|